News News
Investment license for Puppet Theatre project
The Provincial People’s Committee has just issued the investment license of the project of Hue ancient capital puppet and traditional art theatre for Dat Viet Organizer Co., Ltd.
Official perspective design of Puppet Theatre
Implementation place of this project is on Nhu Y River’s surface, near Nguyen Sinh Cung – Han Mac Tu (Hue) crossroads. The scale of this theatre is 900m2, total construction area is 306m2 with the maximum capacity of 150 audiences/performance.
The theatre includes six major areas: the reception area, the executive offices area, the traditional display area, the main stand, the long lobby area, the stage and technical area.
The theatre is built on Nhu Y River
The total investment capital is over VND 6.9 billion. The operational time is 30 years from the day of issuing investment decision. The project will be set to work in the first quarter of 2018 and come into operation in the second quarter of 2018.
The Hue ancient capital puppet and traditional art theatre will contribute to the building of a destination with special cultural art products and support the development of Thua Thien Hue tourism.
By Minh Hien
- SOS Children’s Village taught swimming for free (14/07)
- Thua Thien Hue maintains top 5 in the 2021 PAR INDEX (26/05)
- Releasing 32.000 fishes to regenerate aquatic resources in the Huong River (22/05)
- Presenting 10.000 national flags to fishermen (18/05)
- Story of President Ho Chi Minh's life through “The Seeker for the Image of the Nation” exhibition (31/03)
- 250 athletes participate in the national 25m-pool Swimming and Diving Championship 2022 (06/03)
- The No. 4 volunteer medical delegation established to support HCMC in the fight against the pandemic (23/08)
- Hue City calls for human resources to participate in COVID-19 pandemic prevention and control (03/08)