News News
More than VND 15.3 billion invested in dredging Perfume River phase 1
This information was released by the investor, the Provincial Management Board of projects on investment in construction of agricultural works and rural development, on January 24.
The project aims to dredge and ream out the Perfume River’s warps with the total area of 5.55 hectares to enable a quick drainage of flood waters and reduce the prolonged inundations in the Perfume River’s lower basins, ensuring safety of works, traffic, ecotourism, environmental improvement, agricultural production, etc.
The fund is from the governmental budget and the mobilization of other sources which will be deployed from now to 2020.
By Hoang Trieu
- SOS Children’s Village taught swimming for free (14/07)
- Thua Thien Hue maintains top 5 in the 2021 PAR INDEX (26/05)
- Releasing 32.000 fishes to regenerate aquatic resources in the Huong River (22/05)
- Presenting 10.000 national flags to fishermen (18/05)
- Story of President Ho Chi Minh's life through “The Seeker for the Image of the Nation” exhibition (31/03)
- 250 athletes participate in the national 25m-pool Swimming and Diving Championship 2022 (06/03)
- The No. 4 volunteer medical delegation established to support HCMC in the fight against the pandemic (23/08)
- Hue City calls for human resources to participate in COVID-19 pandemic prevention and control (03/08)